Selected client projects we are currently delivering or have recently completed. Further details available on request.

5 MW Electrolysis with Battery Storage – EPC Tendering & Award Support

schwaben regenerativ gmbh, Augsburg · Hydrogen / PtX · Ongoing – award 2026, commissioning planned 2027

schwaben regenerativ gmbh is building a green-hydrogen electrolysis plant with up to 5 MW of electrical connection capacity, complemented by a battery storage system for load optimisation – supported by the Bavarian BayFELI funding programme. REACT structures and manages the entire EPC tendering and award process: bidder process, technical bid evaluation, LCOH modelling and award recommendation, plus permitting strategy, site analysis and interface management as well as the coordination of external experts.

Outcome to date: a structured competitive bidding process with established EPC contractors and a robust award decision on schedule.

H₂ Integration of Two Electrolysers into Existing Facilities

ZSW – Centre for Solar Energy and Hydrogen Research Baden-Württemberg, Ulm · Hydrogen / Engineering · Completed 2026

The ZSW integrates hydrogen-producing units at two of its sites into the central H₂ distribution network: a 500 kW electrolyser with a 90 m³ buffer tank and a 10 kW electrolyser with cylinder-bundle storage. REACT carried out the on-site assessment and produced a standards-compliant principle diagram (PFD/P&ID level) of the hydraulic integration for each site – including safety valves, pressure control and metering and control sections in line with the applicable hydrogen codes.

Outcome: a procurement-ready tender basis – the handover package was delivered on schedule within one week of the site visit.

Concept Study & Investment Case for an Energy-Efficient Production Process

CLI Technologies, Taufkirchen near Munich · Industrial decarbonisation / Business case advisory · Ongoing since 2026

CLI Technologies is developing a patented, autoclave-free process for manufacturing laminated safety glass that saves substantial energy and CO₂ compared with conventional film lamination. REACT delivered the concept study in four work packages – technology & process, scale-up & plant concept, business case, funding strategy – including a financial model with scenario and sensitivity analyses, an investor memorandum and a structured investor data room.

Outcome: an investor-ready business case with a robust financial model and a four-stage funding strategy as the basis for the financing round.

proven knowledge

Use cases

Our project portfolio reflects REACT’s commitment to turning complex energy challenges into operational success. Explore our selected projects, where we bridge the gap between innovative concepts and grid-ready realities, supporting industrial leaders and public institutions in their journey toward a net-zero future.

Energy Management System for a Manufacturing Site

The Challenge

A manufacturer with PV self-generation, planned BESS expansion and process loads requires an EMS to orchestrate dispatch, increase self-consumption and prepare for flexibility markets.

Sector

Industrial Manufacturing

Region

Southern Germany

Phase

Concept → Implementation

Our Approach

Outcome

EMS specification ready for procurement, quantified self-consumption uplift, and an operational foundation for future flexibility revenues.

Industrial BESS for Peak Shaving and Self-Consumption​

The Challenge

An energy-intensive manufacturer with significant load peaks faces rising network tariffs and seeks to combine self-consumption optimisation with grid-stabilising revenue.

Sector

Manufacturing

Region

Southern Germany

Phase

Feasibility → FEED

Our Approach

Outcome

Engineered design package with quantified peak-load reduction, expected payback under reference and stress scenarios, and a procurement-ready specification.

Green Hydrogen Feasibility for Industrial Decarbonisation

The Challenge

A process industry operator needs to replace natural gas in high-temperature processes and is evaluating on-site green hydrogen against pipeline offtake from a regional H2 backbone.

Sector

Process Industry

Region

Bavaria / Central Germany

Phase

Concept → Feasibility

Our Approach

Outcome

Investment memo with recommended electrolyser sizing, LCOH range under three scenarios, and a recommended funding pathway with timeline.

Funding Strategy and Business Case for a Hybrid Energy Project

The Challenge

A project developer needs a bankable business case for a hybrid PV + BESS + EMS project and clarity on the optimal funding pathway across BayFELI, KfW and BAFA programmes.

Sector

Project Developer / Investor

Region

Germany

Phase

Investment Decision Support

Our Approach

Outcome

Investment decision supported with a defensible model and an optimised funding stack – moving the project from concept to financial close.